Sherbrooke, Quebec, Canada

In the spring of 2014, Sherbrooke, Quebec, Canada, installed a Pinnacle Zenith series ozone generator system to replace older ozone technology at the site. Pinnacle technology was selected based on its ability to offer the highest functionality and lowest total lifetime cost. The new system allows ozone production to precisely match real-time demand via seamless automatic control of all three (3) ozone generator units. Since installation, the new system has exceeded expectations in terms of performance, reliability, and operating cost.